Produce more from your current fields

The traditional way of considering EOR only after initial production decline needs to change.

In this collection of videos, our technical experts discuss why planning for EOR from the earliest field development stages is the most efficient way to maximize ultimate recovery over the long term.

Holistic, systematic approach

Figuring out how to mobilize remaining oil is just the start. Pushing that mobilized incremental barrel of oil to the surface through the heterogeneities of the reservoir via challenging wells and completions requires mastering all disciplines of the E&P value chain—from reservoir characterization to artificial lift.

This requires that all enablers of the EOR project space, from pore to stock tank, work in the right synchronization per the EOR plan. It also requires managing data from many sources, from the reservoir to surface systems, and all disciplines and scales.